Abstract:This paper puts forward a transformation of the automatic production line of device for assembling and commissioning training based on the S7 communication protocol. This scheme uses S7-1200 PLC as the master station, HMI TP170B, PLC S7-200 Smart and V20 converter as the slave station. This paper mainly introduces the communication method between master station PLC and each slave station.