Abstract:This paper takes Minmen road diverting project as an example,which located at Tiecheng hydroelectric power station.By analyzing the causes of Shamaowan Tunnel collapse,we worked out a solution to the problem.At the same time,a practicing schedule for the construction of tunnels landslide breakthrough has also been proposed in this paper.