Abstract:The design stage of constructional engineering project is the main stage to control the cost. The design budgetary estimate provides the main basis for determining investment cost, and the application of quota design can assure that cost control achieves a good effect in the design stage. After analyzing and researching the rationally applied requirements, advantages and shortages of quota design at the stage of constructional engineering project design, this paper brings forward specific advanced measures.