For the safety of the staff member and the full use of the equipments, the author of this paper describes the conception about using the S7-300 PLC programmable console to achieve the low-pressure coal gas protective system, in order to ensure the smooth production of the 2nd phase of Heat and Power Plant of Panzhihua Iron and Steel Corporation